Home | About | Sematext search-lucene.com search-hadoop.com
 Search Hadoop and all its subprojects:

Switch to Threaded View
Accumulo >> mail # dev >> Use pre-integration-test to start instamo, run tests in integration-test, then stop instamo in post-integration-test?


Copy link to this message
-
Use pre-integration-test to start instamo, run tests in integration-test, then stop instamo in post-integration-test?
Running org.apache.accumulo.proxy.SimpleTest
Tests run: 3, Failures: 1, Errors: 0, Skipped: 0, Time elapsed: 37.844
sec <<< FAILURE!

I am continued to be concerned by this unit test in the proxy module.
And a few others that are long-running. I haven't found time to dig
into the code but I assume it is the issue related to spinning up the
Accumulo processes for the test. Could one instance of Instamo be spun
up during the pre-integration-test and spin down during
post-integration-test as stand-alone processes? Then any tests
associated with Instamo can be run inside the integration-test phase.

On Thu, Mar 21, 2013 at 1:59 AM, Apache Jenkins Server
<[EMAIL PROTECTED]> wrote:
> See <https://builds.apache.org/job/Accumulo-Trunk-Hadoop-2.0/150/changes>
>